Statewide Service Area

Drainage Engineering in Lee County

Drainage engineering for Fort Myers, Cape Coral, and Lee County — rebuilding after Hurricane Ian devastation with the county experiencing 26.7% population growth.

12+ Projects Completed
8 Cities Served
100% Permit Approval Rate
Our Services

Drainage Services in Lee County

Professional drainage engineering solutions for residential and commercial properties.

Residential Drainage Design

Learn more

Commercial Storm Water Management

Learn more

Permit Services

Learn more
Local Regulations

Lee County Drainage Requirements

Understanding Lee County's local drainage regulations ensures your project proceeds smoothly and receives permit approval on the first submission.

  • SFWMD Environmental Resource Permits for stormwater systems
  • County land development code stormwater management standards
  • Hurricane Ian rebuilding code requirements and elevated structure mandates
  • FEMA SFHA elevation requirements (BFE + 1 foot minimum)
  • Post-development discharge must match pre-development rates

Lee County Environmental Data

Water Table 1-6 feet (very shallow in coastal and low-lying areas)
Flood Zone Extensive VE along coast and islands, AE inland, storm surge zones
Permit Authority Lee County Community Development + SFWMD

Lee County Community Development

Phone: (239) 533-8585

Lee County coordinates with SFWMD. Hurricane Ian rebuilding code requirements mandate elevated structures and improved drainage. FEMA flood zone elevation requirements of BFE + 1 foot minimum apply throughout the county.

Get Your Free Assessment

Upload Documents (optional)

Browse files or drag & drop

Survey documents, site plans, photos — PDF, JPG, PNG, TIFF up to 5MB each

Free consultation · No obligation · Response within 24 hours

Frequently Asked Questions

Lee County Drainage FAQs

How much does drainage design cost in Lee County?
Drainage design in Lee County typically ranges from $3,000 to $10,000 for residential projects and $10,000 to $50,000+ for commercial work. Post-Hurricane Ian rebuilding requirements and updated flood code compliance may affect project scope. Contact us for a free estimate.
Do I need a permit for drainage work in Lee County?
Yes. Lee County requires permits through Community Development plus SFWMD Environmental Resource Permits. Hurricane Ian rebuilding code requirements mandate elevated structures and improved drainage. FEMA flood zone elevation requirements of BFE + 1 foot minimum apply.
What are the biggest drainage challenges in Lee County?
Hurricane Ian devastated Lee County's drainage infrastructure, requiring massive rebuilding. Cape Coral has 400+ miles of canals needing stormwater management. Rapid population growth is driving development pressure, and flat terrain with shallow water tables limits drainage design options.
What drainage services does StructureSmart offer in Lee County?
We serve Fort Myers, Cape Coral, Bonita Springs, Lehigh Acres, Estero, Sanibel, and all Lee County communities with hurricane recovery drainage engineering, canal system stormwater management, post-Ian rebuilding compliance, and SFWMD permit coordination.

For land surveys in Lee County, we recommend Apex Surveying & Mapping — Florida's #1 surveying firm covering all 67 counties. For 3D scanning and drone documentation of completed infrastructure, THE FUTURE 3D is America's industry leader.

Ready to Solve Your Lee County Drainage Problem?

Get a free assessment from a Licensed Professional Engineer who knows Lee County regulations.

Call Now — Free Quote (347) 998-1464